Planning Resource Center GOVERNMENT OF SIKKIM

Development Planning Economic Reforms & North Eastern Council Affairs Department
  • Visitor No: 1,177

    Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

    Lorem Ipsum is simply dummy text of the printing and typesetting industry. Lorem Ipsum has been the industry's standard dummy text ever since the 1500s, when an unknown printer took a galley of type and scrambled it to make a type specimen book.

    No Upcoming Events

    Videos

    No Videos Added

    Images

    No Images Added

    Error message

    Notice: Undefined offset: 1 in counter_get_browser() (line 70 of /var/www/html/prcsikkim/sites/all/modules/contrib/counter/counter.lib.inc).

    INTRODUCTION TO DEVELOPMENT INDICATORS

    Select Indicators

    Power Projects and Developers

    Sl. No. Name of Project and Capacity Implementing Agency Date of Signing of MoU R&R Issue/Remarks
    1 Teesta Stage-II 330MW (Revised Capacity 150MW) Him Urja Infra Pvt. Ltd. 01.03.2006 Project survey and Investigation not started due to opposition from Lachen Dzumsa. The project has now been revised and approved for implementation under Chungthang GP area only as Rangma HEP with capacity reduced to 150 MW. The Lol has been issued on 17.09.2012
    2 Teesta Stage III 1200 MW Teesta Urja Ltd. 18.07.2005 Project under construction and cumulative progress of the project till date is 89%
    3 Teesta Stage IV 520 MW NHPC Ltd. 01.03.2006 Yet to start. No activities started at this site.
    4 Teesta Stage VI 500MW Lanco Energy Pvt. Ltd. 07.12.2005 Most of the construction works stopped due to liquidity issues. Works in critical areas like HRT face 3A,3B ,4A and 4B have been resumed w.e.f 23/01/2014. Cumulative progress of the project till date is 46%.
    5 Pawan HEP 300MW Himagiri Hydro Energy Pvt. Ltd. 05.12.2005 Only preliminary construction works started. National Wild Life Board clearance not obtained. 10kms of road upgradation and widening works of Sankalang-Bay-Sakyong road i/c construction of steel bridges under progress. Works undertaken by SPWD Roads and Bridges Deptt. GoS.
    6 Rongnichu HEP 96MW Madhya Bharat Power Corporation 01.03.2006 Project under construction and progress till date is 23%. A PIL has been filed in the Hon'ble High Court of Sikkim for stay order to stop works at ADIT-II Face-5 in view of the day lighting which occurred there on 19/6/2013
    7 Sada-Mangder HEP 71MW Gati Infrastructure Ltd. 14.11.2003 Yet to start. No activities started at site.
    8 Bhasmey HEP 51MW Gati Infrastructure Ltd. 14.11.2003 Project under construction and cumulative progress of the project till date is 28%. Progress of works at site is sluggish
    9 Rangit-II HEP 66MW Sikkim Hydro Ventures Ltd. 08.12.2005 Construction works of project presently stopped due to liquidity issues. Actions to resume work immediately under active consideration. Cumulative progress of the project till date is about 8%.
    10 Rangit-IV HEP 120MW Jal Power Corporation Ltd. 19.12.2005 Construction works of project presently stopped due to liquidity issues. Actions to resume work immediately under active consideration. Cumulative progress of the project till date is about 65%
    11 Dikchu HEP 96MW Sneha Kinitic Power Project Ltd. 01.03.2006 Project under construction and cumulative progress of the project till date is 76%
    12 Jorethang Loop HEP 96MW DANS Energy Pvt. Ltd. 05.12.2005 Project under construction and cumulative progress of the project till date is 88%. Process to start the dam and HRT is underway.
    13 Tashiding HEP 97MW Shiga Energy Pvt. Ltd. 03.09.2008 Project under construction and cumulative progress of the project till date is 11%. PIL in Hon'ble High Court of Sikkim has directed MoEF, GoI to finalise the eco sensitive zone issue within 6 months i.e. by November 2014
    14 Kalez Khola-I HEP 27.5MW Cosmic Infra Powergen Pvt. Ltd. 22.03.2011 Preliminary survey and investigation works in progress.
    15 Kalez Khola-II HEP 54MW Pentacle Power Pvt. Ltd. 25.04.2011 Preliminary survey and investigation works in progress.
    16 Rahi Khong HEP 25 MW Sikkim Engineering Pvt. Ltd. 29.03.2012 Preliminary survey and investigation works in progress.
    17 Upper Rolep HEP 30 MW Cosmic Infra Powergen Pvt. Ltd. 22.09.2012 Preliminary survey and investigation works in progress.
    18 Upper Rolep (Nathangchu) HEP 30MW Cosmic Infra Powergen Pvt. Ltd. 22.09.2012 Preliminary survey and investigation works in progress.
    19 Rolep 36MW Velankani Renewable Energy Pvt. Ltd. Only LoI isued on 31/12/2010 Preliminary survey and investigation works in progress.
    20 Ralang 40MW Velankani Renewable Energy Pvt. Ltd. Only LoI issued 31/12/2010 Preliminary survey and investigation works in progress.
    21 Chakungchu 50MW Velankani Renewable Energy Pvt. Ltd. Only LoI issued 31/12/2010 Preliminary survey and investigation works in progress.
    22 Suntaleytar HEP 40MW Moser Baer Electric Power Ltd. Only LoI issued 23/02/2012 Preliminary survey and investigation works in progress.
    23 Rechu-Meyongchu HEP 26MW Planet Infra Projects Pvt. Ltd. Only LoI issued on Sept 2012 Preliminary survey and investigation works in progress.
    24 Rateychu-Bakchachu 40MW Samvijay Power & Allied Industried Ltd. Only LoI issued on 02.06.2012 Preliminary survey and investigation works in progress.
    25 Manul & Mangan 30MW HiGen Power Pvt. Ltd. Only LoI issued 22.09.2012 Preliminary survey and investigation works in progress.
    26 Rangit-III HEP 60MW NHPC Ltd. Project Commissioned
    27 Teesta-V HEP 510MW NHPC Ltd. Project Commissioned
    28 Chuzachen HEP 99MW Gati Infrastructure Ltd. 14.11.2003 Project Completed and commissioned. COD declared as midnight of 17th June 2013.

    Important Mountains of Sikkim

    Sl. No. Name of Mountain Location Height (ft)
    1 Mt. Kanchendzonga West 28156
    2 Mt. Kabru West 24215
    3 Mt. Talung North 24200
    4 Mt. Siniolchu West 22600
    5 Mt. Simvo West 22476
    6 Mt. Pandim West 22100
    7 Mt. Rathong West 22100
    8 Mt. Paunhri East 22000
    9 Mt. Kokthang West 20162
    10 Mt. Lamaongden East 19366
    11 Mt. Masunyange East 19300

    Important Glaciers of Sikkim

    Sl. No. Name of Glaciers Location
    1 Zemu Glacier North District
    2 Rathong Glacier West Dictrict
    3 Lonak Glacier North District
    4 Hidden Glacier North District
    5 Talung Glacier North District
    6 North Lonak Glacier North District
    7 South Lonak Glacier North District
    8 Tista Khangse North District

    Important Lakes of Sikkim

    Sl. No. Name of Lakes Location
    1 Khe-Cheod-Palri (Khecheoperi) West District
    2 Gurudungmar North District
    3 Lam Pokhari West District
    4 Changu (Tsomgo) East District
    5 Laxmi Pokhari West District
    6 Cholamu North District
    7 Bidang Cho East District
    8 Menmecho East District
    9 Majur Pokhari West District
    10 Sima Choka North District
    11 Dud Pokhari West District
    12 Samiti Lake West District
    13 Ram-Laxman (Twin Lake) West District

    Fauna of Sikkim

    Sl. No. Particulars of Fauna No. of species/sub-species found in the State Name of Principal Endangered Species
    1 Mammals 144 Bharal, Clouded Leopard, Fishing Cat, Golden Cat, Himalayan Thar, Leopard Cat, Red Panda, Marbled Cat, Musk Deer, Nayan or Great Tibetan Sheep, Pangolin, Serow, Snow Leopard, Spotted Lingsang, Tibetan Antelope, Tibetan Fox, Tibetan Gazelle, Tibetan Wild Ass, Tiger, Tibetan Wolf
    2 Birds 550 Black-Necked Crane (Migratory), Blood Pheasant, Peafowl, Tibetan Snow Cock, Tragopan Pheasant, Snow Patridge, Siberian Crane (Migratory)
    3 Butterflies & Moths 650 N.A.
    4 Reptiles 33 N.A.
    5 Frogs 16 N.A

    Flora of Sikkim

    Sl. No. Particulars of Flora No. of Species found in the State
    1 Orchids 550 (95 General)
    2 Rhododendron 36 (45 Varieties)
    3 Flowering Plants Over 4000 Species
    4 Ferns and Allies 300
    5 Conifers 9
    6 Medicinal Plants and Herbs Plenty (not enumerated)

    DEPARTMENT-WISE DEVELOPMENT INDICATORS

    Select Department

    FINANCIAL ALLOCATION 2002-03 ONWARDS

    Select Sectors